! crypto pki trustpoint SLA-TrustPoint enrollment terminal revocation-check none ! ! license smart url cslu <SSM On Prem - CSLU URL> license smart url cslu https://10.123.123.123/cslu/v1/pi/Collaboration-7 ! CUBE-LAB#license smart sync local
You can spend this process up by doing manually syncs.
CUBE-LAB#show platform software license dlc Index 1 Feature: uck9 Permanent License: 1 EVAL RTU License: 0 RTU License: 0 Paper License: 0 DLC Process Status: Completed DLC Conversion Status: SUCCESS
license smart url cslu https://ssm-server/cslu/v1/pi/collab-1 license smart transport cslu no license smart server-identity-check
Note: Install Guides are included in the upgrade zip file. Download the latest v8 version and extract. It also contains the upgrade.sh and upgrade.sh.sha256 files - which you copy to the server - as per below steps.
Note: As part of SSM On-prem upgrade, stale data is cleaned up from older releases. This process might take several hours, SSM On-prem upgrade will not complete until this clean up is complete. SSH session will be timed out, you will be logged out of the terminal and On-prem won’t respond (both GUI port and product port) until upgrade completes.
ssh admin@<your ip address> onprem-console copy <your username>@<your remote host.com>:/path/SSM_On-Prem-8-202302_upgrade.sh patches: copy <your username>@<your remote host.com>:/path/SSM_On-Prem-8-202302_upgrade.sh.sha256 patches: upgrade patches:SSM_On-Prem-8-202302_Upgrade.sh
After the system has completed the upgrade (approximately 5-15 minutes), you are notified that the process is complete. At this point the system automatically reboots. NOTE: If the system does not automatically reboot, manually reboot your system.
Once the reboot has completed, perform a synchronization on the system.